A 12-pile cap: from a 3D model to strut-and-tie

A deep pile cap model in CalculiX shows how load travels from the pier to the piles and how cracking changes the tension path near the underside.

Article · 4 November 2026. Concrete structures, using Gmsh, CalculiX, PrePoMax.

The question

How is tension distributed near the underside of a deep cap on twelve piles? A strut-and-tie model estimates the tie force. A three-dimensional model also shows how much of the width carries tension and how that distribution changes as the concrete cracks.

The pile cap measures 13.2 × 9.6 m in plan and is 2.5 m deep. It sits on a 4 × 3 grid of 1,200 mm diameter piles at 3.6 m centres. The central pier measures 4.0 × 1.5 m in plan. The hypothetical actions are a vertical load of 48 MN and a moment of 30 MNm about the transverse axis. The model uses symmetry and represents the piles with short solid segments supported by vertical springs. Self-weight is omitted.

Where tension travels in the elastic model

The first model uses quadratic tetrahedral elements and uncracked concrete. The vertical reactions sum to 24.00 MN in the half-model, equal to the applied vertical load. At the mid-length section, the FEM estimate of the tensile resultant over the full cap is 29.4 MN. The hand-calculated strut-and-tie model gives about 30 MN, a difference of roughly 2% for this case.

In the elastic model the tension spreads over about 7.6 m of the 9.6 m width. The maximum principal stress reaches 9.7 MPa, above the assumed mean tensile strength of 3.0 MPa. The elastic stress field shows the load path. To understand the contribution of the reinforcement, the model must also represent the loss of tensile stiffness.

Underside view of the half-model. Principal tensile stresses form a broad band between the pile heads.

Model A, uncracked elastic concrete. Maximum principal stress σ₁ in PrePoMax.

What changes when the concrete cracks

The second model concentrates the tie bars in 1.2 m bands over the pile rows. The bars share nodes with the concrete mesh, which assumes perfect bond. An initial attempt using isotropic stiffness degradation failed to converge because it also weakened the compression paths. In the revised model, once the tensile threshold is exceeded, stiffness is reduced chiefly in the direction normal to the crack. The crack orientation stays fixed.

With this approach, the force in the bars crossing the middle section stabilises at about 6.0 MN in the half-model for the reinforcement arrangement studied. The cracked model still has a residual imbalance of around 2.3 MN in the section resultant. The bar force describes how this model transfers tension from concrete to steel. Estimating a design tie force would require a more accurate section equilibrium check.

Underside view of the cracked half-model. The remaining tensile stress field is more localised.

Model B, reinforcement concentrated in bands and concrete stiffness reduced normal to the cracks. Maximum principal stress σ₁ in PrePoMax, with the main scale running from 0 to 6 MPa.

What the two models tell us

The strut-and-tie model gives an initial estimate of the overall tie force. The 3D model helps locate the tie and shows how its distribution depends on the pile stiffness, bar layout and cracking model. The methods provide information at different scales even when their overall estimates are close.

This numerical study uses hypothetical actions, perfect bond, idealised pile springs and a simplified cracking model. A design would require the actual load combinations, pile stiffnesses and separate checks for struts, nodes, anchorage, minimum reinforcement and serviceability.